Shanghai
Shanghai Airport City Terminal Renovation
Shanghai Airport City Terminal Renovation
  • The terminal building was opened in 2002 and was remodeled due to functional and cosmetic issues. Under the premise that the site, area and function remain unchanged, the feature of “three-stage setback” is retained and a folded panel curtain wall is introduced. Inside the building, the floor slabs will be opened up to bring in light and a circular atrium space will be set up. Four functional areas will be introduced on the 5th floor, which will be integrated with the Jiu Guang Department Store to create a city parlor.