Jiangsu Telecom Jiangbei Data Center, Yizheng, Yangzhou, China
The project covers a total area of 375 mu, and plans to construct 11 data machine buildings and 2 data integration buildings, etc. After completion, it can accommodate 32,000 high-power cabinets and 600,000 servers. Upon completion, the project can accommodate 32,000 high-power cabinets and 600,000 servers, making it the largest resource pool of Tianyi Cloud in East China. It adopts energy-saving technologies such as high-voltage direct current and cold channel closure, which reduces the PUE to below 1.25. It is also equipped with dual power supply, national trunk line transmission wavelength division nodes, and low-latency direct connection to the national Internet backbone nodes.